Kerala High Court directs Railways to shift electrical infrastructure at Pachalam
You don’t have any Active Subscription.
Account subscription benefits alongside Premium Stories, Editorials, Opinions and more. Unlock these with Subscription
The Kerala High Court has directed the Railways to take appropriate steps within two weeks to shift electrical installations that jut into the road near the Pachalam overbridge to the adjacent railway land, to enable smooth traffic movement.
The electrical infrastructure is currently hindering the smooth flow of vehicles in the area. The Kochi Corporation submitted that it had sanctioned ₹1.60 lakh and handed over a cheque for the amount to the Kerala State Electricity Board (KSEB). The KSEB said it had received the cheque and that an application was filed before the Railway authorities on September 11, seeking to shift the electrical infrastructure to the adjacent railway land.
Heeding a previous direction, the additional secretary of the Corporation and the executive engineer of the KSEB were present before the High Court on Wednesday (September 16, 2026), when the direction was issued. A public interest litigation in this regard had been filed by Sujith C. Sukumaran of Pachalam, based on which the court issued the direction.
The matter has been posted for hearing on September 30.
Comments have to be in English, and in full sentences. They cannot be abusive or personal. Please abide by our community guidelines for posting your comments.
We have migrated to a new commenting platform. If you are already a registered user of The Hindu and logged in, you may continue to engage with our articles. If you do not have an account please register and login to post comments. Users can access their older comments by logging into their accounts on Vuukle.

